Discuss Critical Path Method (CPM) Scheduling.
Perform a forward and a backward pass.
Discuss float, and its impact on a schedule.
Identify loops and open ends.
Calculate a schedule.
Analyze the scheduling log report.
Calculate multiple float paths when scheduling.
Discuss the differences among scheduling logic options.
Discuss a calendar’s effect on lag.