3/28/12 Public Meeting/Workshop * Preliminary Evaluation of Health Effects for Hypothetical Exposures to Contaminants from the Interim Waste Containment Structure * Radon Assessment * Meteorological Data Evaluation
Tape 12: 409, north pond, Hittman, NE quad, 401 Building 409 demolition, north pond cleanup, Hittman building, NE quad pumping, compactor at 401, excavation south of decon plant, more. 11 minutes
Tape 11: Partially Narrated, 411 and 409 Pumping building 411, demolition of buildin g 411, demolition of building 409, cap erosion from winter, more. 22 minutes
Tape 7: Narrated Footage, Part 3 of 3 Installing pond 3 liner, final 434 demolition, placing rubble in IWCS, filling pond 3, placing sand bed in 411, more. 1 hour, 18 minutes
Tape 7: Narrated footage, Part 2 of 3 Installing pond 3 liner, final 434 demolition, placing rubble in IWCS, filling pond 3, placing sand bed in 411, more. 1 hour, 29 minutes
Tape 7: Narrated Footage, Part 1 of 3 Installing pond 3 liner, final 434 demolition, placing rubble in IWCS, filling pond 3, placing sand bed in 411, more. 1 hour, 30 minutes
Tape 6: Part 2 of 3: Narrated Footage Including hydraulic mining of 434, residue transport from 434 to 411, tower demolition, more. 1 hour, 20 minutes.
Tape 6: Narrated Footage - part 1 of 3 Narrated Footage including hydraulic mining of 434, residue transport from 434 to 411, tower demolition, more. 1 hour, 34 minutes