The road infrastructure of PoK deteriorating day by dayMuzaffarabad, PoK, February 24, 2015:- The Pakistani government has failed to develop state-of-the art infrastructure in Pakistan occupied Kashmir. The roads in the region are in dismal condition, and using of sub-standard material, by the authorities, in its construction causes frequent landslides, putting the lives of the people at risk. The Muzafafrabad-Srinagar Highway, which is the vial trade link between the two sides of Kashmir, is in a dismal state, with damages and landslides, caused by the September 2014 floods, at many places. However, despite passing of several months, the authorities have failed to rebuild this connectivity and alleviate the damages. The highway was constructed after the 2005 earthquake by National Highways Authority (NHA) of Pakistan. However, using the substandard material in its construction, the road, which is a hilly terrain, often faces landslides. The Pakistan Occupied Kashmir, which is in illegal occupation of Pakistan, has been the victim of government’s apathy since 1947, and the authorities have failed to improve the standard of living in the region.